Bayswater NCL, LLC

KEC provided engineering and wellsite supervision for two challenging directional redrills in the Coles Levee Eco Preserve near Tupman, CA. The wells were redrilled to new bottom hole locations in the Stevens. They were then fracked and became the best two wells in the field.

KEC also provided engineering and wellsite supervision for a field-revitalization stimulation program in the Coles Levee Eco Preserve.