Noble Energy Inc.

KEC provides well site supervision in the ongoing Niobrara horizontal drilling program in the Denver-Julesburg Basin, located in northeastern Colorado. Multi-well pad drilling at 6,000’ TVD with 5,000’ to 10,000’ laterals and multi-stage packer completions. Directed operations on record well to date, 16,000’ MD with intermediate casing at 6,500’ and production casing successfully landed at TD. Total cycle time of 6.25 days from spud to rig release.

KEC supplied Drilling Superintendent and on-site supervisors for four well remote exploratory drilling program in northeastern Nevada. All wells drilled on time and under budget. Also supervised the frac completions on all four wells. Resulted in first unconventional oil production in state.

On site supervision of 29 stage horizontal Wolfcamp completion in Permian Basin, west Texas. All zones were plug and perf via pump-down guns.