Oilfield Water Logistics
October 9th, 2015 by Alison Bradley
KEC provided downhole and facilities engineering services to evaluate a commercial water disposal project in Oxnard, CA.
October 9th, 2015 by Alison Bradley
KEC provided downhole and facilities engineering services to evaluate a commercial water disposal project in Oxnard, CA.
October 9th, 2015 by Alison Bradley
KEC provided engineering, project management and field supervision services for Vaca Energy’s drilling, workover and completion operations in Oxnard California.
October 9th, 2015 by Alison Bradley
KEC currently provide drilling engineering, project management and drill site supervision for Holmes Western’s drilling projects. To date, KEC has assisted HWOC in drilling 100+ wells from Coalinga to Pyramid Hills to South Midway Sunset.
October 9th, 2015 by Alison Bradley
KEC provided engineering and wellsite supervision for two challenging directional redrills in the Coles Levee Eco Preserve near Tupman, CA. The wells were redrilled to new bottom hole locations in the Stevens. They were then fracked and became the best two wells in the field. KEC also provided engineering and wellsite supervision for a field-revitalization […]
October 9th, 2015 by Alison Bradley
KEC assisted in the planning and engineering of a steam-pilot program on the Kreyenhagen Ranch near Coalinga, California. KEC also engineered and managed the drilling of two directional delineation wells for Solimar Energy in the Kreyenhagen field.
October 9th, 2015 by Alison Bradley
KEC provides well site supervision of horizontal Wolfcamp completions in Permian Basin, west Texas. All frac operations are plug and perf pumpdown operations via frac fleet for each successive stage. Job size ranges from 27 to 40 stages.
October 30th, 2013 by Alison Bradley
KEC provided well site supervision for deep Niobrara horizontal drilling wells. Operations involved managed-pressure and flow drilling through a flowline choke during horizontal portion of wells.
October 30th, 2013 by Alison Bradley
KEC provides well site supervision in the ongoing Niobrara horizontal drilling program in the Denver-Julesburg Basin, located in northeastern Colorado. Multi-well pad drilling at 6,000’ TVD with 5,000’ to 10,000’ laterals and multi-stage packer completions. Directed operations on record well to date, 16,000’ MD with intermediate casing at 6,500’ and production casing successfully landed at […]
October 30th, 2013 by Alison Bradley
KEC provided the Country Drilling Manager and staff of on-site supervisors for exploratory drilling program in Belize, Central America. As part of the exploration program, KEC drilled and successfully evaluated the first 12,000’ extended reach well in the country. Successfully diagnosed a differential sticking situation and recovered drill pipe, allowing us to cancel the planned […]
September 6th, 2013 by
KEC engineered and managed an eight well re-drill program on Platform Hogan, Santa Barbara Channel.